Services
What we can do.
Delivery & installation
Each buffer block is preassembled ready for installation, except for the guide
claws and brake elements, which need to be fitted once the block is positioned on the track.
Also the track reinforcement can be supplied preassembled for braking buffer stops
with additional brakes, which allows them to be directly placed on the prepared area.
As a result, only short track closure periods are necessary for the installation.
Delivery or pick-up of the rail end blocks is by rail or truck, depending on the order.